Pull the film leader through the pre-stretch roller assembly by following the threading diagram located inside the film carriage.
To get the best results, always refer to the specific, authorized manual that accompanied your machine.
is engineered to handle substantial industrial loads with high efficiency.
After the cycle finishes, the operator must manually cut and seal the film. Maintenance & Support Itw Mima 4.4 Manual
button to initiate the wrap cycle. A "load sensing" photo eye automatically detects the top of the pallet for consistent wrapping. Emergency Stop : To halt operations immediately, press the red mushroom Emergency Stop button. Twist it clockwise to reset before resuming. Maintenance and Troubleshooting
This section is written for the daily user. It includes:
To operate the 4.4:
The operator pulls the leading edge of the stretch wrap from the Pace carriage and secures it firmly to the base of the pallet load.
Note: As of April 2024, Quick Pak Inc. confirmed they stock parts for the ITW Mima and Signode Stretch Wrap lines, including the 4.4 series. If your manual is missing page numbers, calling these suppliers with your machine's serial number can yield a direct match for the part.
Built with integrated forklift transport slots at the base for easy moving. Pull the film leader through the pre-stretch roller
Use the elevator creep button to slow the carriage at specific heights, allowing for extra reinforcement wraps. 4. Operation Sequence Press the "Start" button to begin the turntable rotation.
Safety is the primary focus of any Mima 4.4 manual. Operators must adhere to these guidelines to prevent injury: